翻訳と辞書 |
Daegok–Sosa Line : ウィキペディア英語版 | Daegok–Sosa Line
The Daegok–Sosa Line is a future subway line scheduled to open in late 2017. The line would have between five to eight stations. ==History== The line will consist of 17.8 km or 19.6 km of track from Sosa to Daegok. This would connected Sosa with the Sosa–Wonsi Line through Bucheon, Gimpo Airport, and into Ilsan in Goyang City. The line will have transfers available for Line 7 at Bucheon Stadium Station, Lines 5, 9, and Arex at Gimpo Airport Station, and Line 3 and the Gyeongui Line at Daegok Station. Construction was scheduled to begin in the second half of 2012 for a completion date of 2017.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Daegok–Sosa Line」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|